IT Planning Checklist for an Engineering Firm Office Move
Moving office is a business project.
It is also an IT project.
Internet connectivity.
Wi-Fi.
Networks.
Workstations.
Meeting rooms.
Phones.
Servers.
Leave technology planning too late and move day can become much harder than it needs to be.
Here are ten things engineering firms should plan.
1. Involve IT Early
Do not wait until the lease is signed and moving dates are fixed.
IT may need to consider:
– Connectivity.
– Cabling.
– Server rooms.
– Power.
– Wi-Fi.
– Access.
Early involvement creates more options.
2. Order Connectivity Early
Internet services can have lead times.
Understand:
– Available services.
– Required speeds.
– Installation dates.
– Resilience options.
– Existing contract implications.
Do not assume broadband will be ready when the furniture arrives.
3. Plan The Network
Review requirements for:
– Switches.
– Firewalls.
– Network points.
– Cabinets.
– Cabling.
– Printers.
– Specialist equipment.
Design the network around how the new office will actually work.
4. Plan Wi-Fi Coverage
Think beyond putting one access point in the middle of the office.
Consider:
– Floor layout.
– Meeting rooms.
– User numbers.
– Building materials.
– Guest access.
– Device density.
Plan coverage before problems appear.
5. Review Workstation Requirements
Decide what moves and what gets replaced.
Consider:
– Engineering workstations.
– Laptops.
– Monitors.
– Docks.
– Peripherals.
– Meeting room technology.
An office move can be a useful lifecycle planning point.
6. Plan Server And Storage Moves
If infrastructure is moving, plan carefully.
Consider:
– Shutdown.
– Transport.
– Reinstallation.
– Testing.
– Backup.
– Contingency.
Critical infrastructure should have a documented move plan.
7. Plan Communications
Review:
– Phone systems.
– Teams calling.
– Numbers.
– Meeting rooms.
– Reception.
– Call routing.
Make sure clients can still reach you during the transition.
8. Create A Move-Day Plan
Document:
– Who does what.
– What moves first.
– What gets tested.
– Who signs off.
– What happens if something fails.
Do not manage move day from memory.
9. Test Before Employees Arrive
Test:
– Internet.
– Wi-Fi.
– Applications.
– Printers.
– Phones.
– File access.
– Meeting rooms.
Find problems before Monday morning.
10. Have A Contingency Plan
Consider what happens if:
– Connectivity is delayed.
– Hardware fails.
– An application does not work.
– The move overruns.
Have alternative working arrangements where practical.
How The Geek Guys Helps
At The Geek Guys, we help engineering firms plan the technology side of office moves before moving day arrives.
From connectivity and networks to workstations, servers and testing, we help create a practical plan for getting the new office working.
Final Thoughts
Involve IT early.
Order connectivity.
Plan networks.
Design Wi-Fi.
Review hardware.
Plan infrastructure moves.
Sort communications.
Document move day.
Test everything.
Have a backup plan.
The best office IT move is the one employees barely notice.
FAQS
IT should be involved as early as practical because connectivity, cabling, infrastructure and supplier requirements may have significant lead times.
Lead times vary depending on location and service, so availability and installation times should be checked early in the move planning process.
Not necessarily, but an office move is a useful opportunity to review device age, condition and future requirements.
Early planning, documented responsibilities, pre-move testing and sensible contingency arrangements can help reduce disruption.
Yes. An IT provider can coordinate connectivity, infrastructure, devices, suppliers, migration and testing as part of the relocation project.